Bronte Green Development is developing of a new residential community on the former Saw Whet Golf Course lands along Bronte Road. This subdivision will include approximately 1,181 residential units through a mix of single family homes, townhouses and low-rise apartments.

This transit-friendly community has space for an elementary school and provides land for parks and a trail system while preserving sensitive environmental lands that are critical habitat to endangered and other species of wildlife.

This development was approved in an Ontario Municipal Board (OMB) settlement between the Town of Oakville and Bronte Green.       

Status update: Construction underway

Detailed engineering plans were submitted to support the start of limited and controlled works on the lands.

Wildlife Rescue and Relocation permits from the Ministry of Natural Resources and Forestry were secured and executed to address the conditions imposed pertaining to the wildlife in the existing Golf Course Pond.

A site alteration application is under review to permit the following works to proceed in a controlled and monitored manner:

Stage 1 -  Tree fencing:

Installation of tree hoarding (silt fencing) – Permit Issued

The owner’s tree preservation plan requires them to protect some existing trees during construction. The site was inspected for compliance and deemed acceptable to allow for Stage 2.

Stage 2 – Tree removal:

Removal of select trees and stumps – Permit Issued

Update: On March 6, 2018 the remaining tree and stump removals from the developable area of the Bronte Green lands will begin and are scheduled to be completed within the week.

These tree removals are part of the approved tree preservation plan but were delayed pending the late 2017 expiration of the Temporary Use License on the former Regional Operations Yard lands and need to remove trees by hand within the Regional Sanitary Sewer Easement Area. See the Bronte Green Tree Removal Areas (pdf) map for more details.

In November 2017, the owner completed the majority of the tree and stump removal as per the approved tree preservation plan.

Detailed assessment and engineering plans have been reviewed and accepted. These plans outline the area of the site that will be impacted by the grading, servicing and re-contouring necessary to support new residential development.

Tree planting

The owner’s tree preservation plan requires them to protect some existing trees during construction as well as plant several new trees that will increase the overall canopy cover on these lands.

  • The site currently has an estimated 10 per cent canopy cover. The proposed planting plan will deliver a canopy cover of approximately 35 per cent.
  • 1,326 out of 1,752 trees will be removed from the site. 
  • Over 3,500 trees will be planted near the end of the construction/home build process.

Review the proposed Tree Planting Plan (pdf). This plan is currently under review and subject to change.

The following table sets out the canopy transition that will take place on these lands:

Tree statistics

  • Total trees (current state) - 1749
  • Total trees to be removed - 1326*
  • Total trees to be retained - 423
  • Total trees to be planted - 3529
  • Total trees (future state) - 3952

* Comprised of 25% Ash Trees and 46% Non-Native Species.

Canopy coverage

  • Total area of Bronte Green site - 54.79 hectares     
    • Existing canopy coverage - 5.87 hectares (10.7%)
    • Planned canopy coverage - 19.31 hectares (35.2%)   
        

Stage 3 - Site grading

Topsoil stripping and major earthworks/site grading. This step allows for the lands to be shaped to support the new development — Permit Issued.

The earthworks/site alteration for this site are divided into four phases as outlined below. See the Bronte Green Earthworks/Site Alternation map (pdf) for more details.

All draft plan conditions required to be satisfied prior to Phase 1 earthworks and grading have been complied with.

Phase 1: The developable lands only (excludes any required works within and along the Natural Heritage lands – see Phases 2, 3 and 4 below).

  • Earthworks within Hydro One lands and the Region of Halton easement require separate agreements from Hydro One and the Region respectively. 
  • The developer has agreements in place with Hydro One and the Region of Halton to cross the corridors with vehicles.

Timing for the remaining phases below will be posted as work progresses on Phase 1.

Phase 2:  Required Minor earthworks and slope blending within and along the abutting Natural Heritage (NH) lands.

Update: November 19, 2018 — All relevant draft plan conditions have been complied with for the proposed wildlife pond. Earthworks for the pond have been approved and will commence shortly. These works are within the limits of the Phase 2; however, they will not affect any trees in the NH lands or the Conservation setbacks. The developer is hoping to collect the spring run-off to help fill the pond.

Phase 3:  Required Enhancement works within and along the abutting Natural Heritage lands.

Phase 4:  Construction of stormwater outfalls that extend in the abutting NH lands.

Stage 4 – Underground servicing:

The developer has received approval from the town and region to commence underground servicing of the lands. Servicing may commence as early as February 20, 2019.

It’s anticipated that this community will develop in phases over a period of years. Land grading and servicing will take about one to two years to complete. Housing construction may start as early as late 2018 and depending on approvals and market up-take, home construction may well continue into 2020. The higher density development parcels along Bronte Road are expected to be developed in later phases of the plan, likely beyond the year 2020.

Bronte Green’s property consists of 54.79 hectares of land. Of that land:

  • 37.33 ha (68.1%) will be developed for residential units, commercial uses and roads.
  • 10.09 ha (18.4%) will be added to the Natural Heritage System and dedicated to the Town. This includes the natural area originally proposed by Bronte Green and “Enhancement Areas” achieved through the settlement process.
  • 5.53 ha (10.1%) Will be dedicated to the town as Parks (2.5 ha), Open Space (.72 ha), Walkways (.20), and additional open space encumbered by existing pipeline (.14) or as a stormwater management pond (which in addition to the pond, serves an open space function).
  • 1.84 ha (3.3%) Is reserved for a school block for a period of seven years

At the end of the day, 17.46 ha (31.8%) (exclusive of roads) will come into public ownership, the majority of which consists of natural heritage areas that have been saved from development.

Bronte Green, did extensive work to complete the required technical studies and made substantive changes to meet the town’s requirements.  As a result, Bronte Green is:

  • Dedicating a significant parcel of land to enhance the woodlands
  • Increasing the size of the buffer around the natural features from 10 metres to 30 metres in order to better protect the natural heritage system from the impacts of development and to reduce flood and erosion impacts.
  • Creating a 2 hectare (over 5 acre) habitat area for local wildlife including turtles. They have secured and executed the necessary Wildlife Rescue and Relocation permits from the Ministry of Natural Resources and Forestry to address the conditions imposed pertaining to the wildlife in the existing Golf Course Pond.
  • Constructing stormwater management systems to ensure quantity and quality controls.
  • Securing a permanent natural heritage linkage to Bronte Creek Provincial Park.

Reserving an elementary school site adjacent to a centrally located neighbourhood park

In Oakville, private healthy tree removals, for trees 15 cm DBH (diameter at breast height) or greater, can only proceed with the approval of the town.  Approvals are provided in one of two ways:

  1. Issuance of a Private Tree Permit (Private Tree Bylaw), OR
  2. Granting of Development Approvals (Planning Act approvals)

The town is allowed to impose conditions with each approval.

In the case of this Bronte Green development, the conditions set out in the Planning Approval required the owner to develop a tree preservation and planting plan for this site.

Land re-development works typically require significant land alteration (requiring tree removal) to ensure proper community design and function, and the tree preservation plan took into account these necessary alterations.

While the plan requires the removal of some 1,300 trees early in the process, the owner is required to plant over 3,500 new trees within and around this new community area.  The site currently has an estimated 10 per cent canopy cover. The new plantings will deliver a canopy cover of approximately 35 per cent.

Beacon Environmental has been retained to provide professional oversight on the specific matter of active and ongoing environmental site monitoring. They will ensure that approved/required site controls are in place, monitored and maintained.

Town of Oakville, Conservation Halton and Region of Halton will also actively monitor the progress of work on this site to ensure proper steps and actions are being taken with respect to environmental protection and reporting requirements, access/egress controls, work hour limitations, dust mitigation protocols and, construction/building compliance.

The following sets out the canopy transition that will take place on these lands:

Canopy coverage 

  • Total area of Bronte Green site - 54.79 hectares          
    • Existing canopy coverage - 5.87 hectares (10.7%)  
    • Planned canopy coverage - 19.31 hectares (35.2%)
        

Tree Statistics

  • Total trees (current state) - 1749
  • Total trees to be removed - 1326 (Comprised of 25% Ash Trees and 46% Non-Native Species)
  • Total trees to be retained - 423
  • Total trees to be planted - 3529
  • Total trees (future state) - 3952

Background

  • June 21, 2017 - the OMB issued its decision (pdf) approving the development.
  • November 28, 2016 - Mayor Burton issues statement on Bronte Green settlement proposal
  • January 7, 2015 - Bronte Green Corporation filed an appeal with the OMB with respect to its official plan amendment application.
  • Oct 28, 2014 - Bronte Green Corporation filed an appeal with the OMB respecting its zoning by-law amendment, draft plan of condominium and draft plan of subdivision applications seeking a decision on its development application.
  • May 12, 2014 - Bronte Green Corporation filed an Official Plan Amendment development application to permit redevelopment of the Saw Whet Golf Course.
  • Mar 7, 2014 - Bronte Green Corporation filed Zoning By-law Amendment, Plan of Subdivision and Plan of Condominium development applications to permit redevelopment of the Saw Whet Golf Course
  • Mar 14, 2013 - The town initiated a comprehensive study of all the lands in the area, known as the Merton Planning Study. This comprehensive study was required by the town's Livable Oakville Plan and was necessary to properly evaluate any redevelopment of the lands.

The following documents relate to the conservation lands owned by the Town of Oakville that border the development.

Addressing growth

Oakville is recognized as a great community in which to live and raise a family and this attracts new residents who want to live in our town. We also have current residents who might need a different type of housing as they start their own family, or as they age in the community. This creates demand for new housing.

The Province of Ontario forecasts growth through its Growth Plan which allocates a certain number of people to our region. This forecasted growth is neither a minimum nor a cap on growth. Oakville, as part of Halton Region, is required to accommodate a certain portion of the growth. How this growth will occur in Oakville is described in our Livable Oakville Official Plan.

The province requires the majority of this growth to be accommodated in areas that are already serviced as part of the town’s urban area.

Saying “no” to new development

All property owners have a right to make applications for amendments to the town’s official plan and zoning by-laws and to file appeals to the Ontario Municipal Board if the town doesn’t approve these applications. The Ontario Municipal Board has an obligation to consider these applications on their merits.

The Ontario Municipal Board has issued previous decisions that confirm that the issue of whether or not the town has already planned to meet the Growth Plan is not determinative of the issue of whether lands that have been identified for potential future development can be developed.

Saw-whet lands and the Parkway Belt

The Saw-Whet lands are no longer part of the Parkway Belt. They were originally part of the provincial Parkway Belt West when this property was owned by the Province of Ontario. After the province sold the land to private interests, they applied to have it removed from the Parkway Belt. Once the province approved this removal, the land was then designated as urban lands by the Halton Region Official Plan. As a result, the town’s Livable Oakville Official Plan identified the need to comprehensively study these lands to determine appropriate future land uses and policies.

How Bronte Green lands are addressed in the Livable Oakville Plan

While not identified as a “growth area,” the lands in the vicinity of the QEW and Bronte Road on the north side were one of two areas in the town identified for potential future development that needed to be comprehensively studied to determine future land uses and policies. Section 26.6.2 of the town’s Livable Oakville Official Plan notes that these comprehensive studies for potential future development areas should address servicing and infrastructure needs, including a detailed transportation needs analysis, phasing of servicing and development, and appropriate lands uses. Approvals for individual site development applications in these areas shall be considered premature until the necessary comprehensive studies are completed. The town’s Livable Oakville Official Plan was unanimously approved by Council in June 2009.

The town opposed the Bronte Green application as it was premature without the above studies. With the ongoing work that has occurred since May 2016, the comprehensive studies required by Livable Oakville have now been completed allowing for the settlement of the development applications contemplated by these policies.

Ontario Municipal Board hearing

The town certainly wanted to stop Bronte Green from implementing its original plan of application because they hadn’t completed the necessary studies and the town felt that it was a flawed plan that did not do enough to protect environmentally-sensitive lands.

The town was opposed to development taking place before comprehensive land use studies could be completed that would ensure environmentally sensitive lands were protected.

On April 8, 2015, Town Council passed the following resolution: “That counsel be instructed to attend the OMB proceedings to oppose the applications as being premature and not in the public interest using an evidentiary approach.” This position was based on serious concerns with the draft plan and the underlying technical studies and was supported by a team of 15 witnesses representing a variety of scientific and planning disciplines.

The town's position

The town’s position has not changed on what was required for this site. The applicant, Bronte Green, did extensive work to complete the required technical studies and made substantive changes to its plan to meet the town’s requirements. Bronte Green made concessions on every issue before the Board. As a result of the settlement, Bronte Green will:

  • Dedicate a significant parcel of land to enhance the woodlands
  • Create a high value habitat for species including snapping turtles.
  • Increase the size of the buffer around the natural features from 10 metres to 30 metres in order to better protect the natural heritage system from the impacts of development and to reduce flood and erosion impacts.
  • Construct storm water management systems which insure that there will be no additional risk of downstream flooding.
  • Remove the vehicular bridge previously proposed over Fourteen Mile Creek which posed a threat to endangered species of fish.
  • Secure a permanent natural heritage linkage to Bronte Creek Provincial Park.
  • Reserve an elementary school site adjacent to a centrally located neighbourhood park.

Public consultation

Public input was received through written and oral participant statements, discussions with participants and past public input in town planning studies was considered and influenced the settlement. Many of the key changes to the settlement plan respond to concerns raised by members of the public.

The actual settlement process was subject to legal rules that prevent the disclosure of information shared until and unless all relevant parties agree. These rules promote the open sharing of information and discussion of options among the parties but do prevent the sharing of information with the public.

The OMB held two days of hearings on November 23 and 24, 2016, to receive participant feedback on the settlement. The OMB will consider this input in making its decision on the settlement.

Development plans

Bronte Green’s property consists of 54.79 hectares of land. Of that land:

  • 37.33 ha (68.1%) will be developed for residential units, commercial uses and roads.
  • 10.09 ha (18.4%) will be added to the Natural Heritage System and dedicated to the Town. This includes the natural area originally proposed by Bronte Green and “Enhancement Areas” achieved through the settlement process.
  • 5.53 ha (10.1%) Will be dedicated to the town as Parks (2.5 ha), Open Space (.72 ha), Walkways (.20), and additional open space encumbered by existing pipeline (.14) or as a stormwater management pond (which in addition to the pond, serves an open space function).
  • 1.84 ha (3.3%) Is reserved for a school block for a period of seven years

At the end of the day, 17.46 ha (31.8%) (exclusive of roads) will come into public ownership, the majority of which consists of natural heritage areas that have been saved from development.

The settlement plan increased the overall number of units from 875 to 1,181 units by providing more townhouses and low-rise apartment units adjacent to Bronte Road. Given the direct access to the Bronte GO, it made sense to encourage a transit-friendly approach for the site and this type of housing will be very attractive to young adults, new families and seniors who want to remain in Oakville.

Overall we have reduced the footprint of the development to be more environmentally sensitive by protecting natural habitat, and providing more open space to address groundwater concerns. Lower density housing has been located adjacent to the valley lands and set back with a 30-metre buffer to also support the natural heritage system.

Traffic

Traffic impact studies were part of the settlement discussions. Since Bronte Road is a regional road, Halton Region looked at the impact on both the current and future capacity of Bronte Road. While there is current capacity for the approved development, the low-rise apartment building at the corner of Upper Middle Road and Bronte Road (180+ units) will not be built until the expansion of Bronte Road is complete.

According to the Region’s capital forecast, Bronte Road is scheduled for expansion to six lanes in 2025.

Schools

A site for an elementary school has been reserved in the plan. The school board has seven years after the registration of the plan to buy the site. If the site is not purchased, it can be developed for low density residential uses.

Glen Abbey Golf Course

Unlike Saw-Whet Golf Course, Glen Abbey Golf Course has never been identified in the town’s Official Plan as having future growth potential. Glen Abbey plays a different role in the cultural, economic and urban structure of the community and this role must be further understood before any proposed changes can be considered. The town is now before the OMB defending a challenge to the validity of the interim control by-law it put in place to complete studies that will inform where these lands might fit into the town’s overall urban structure.

Deerfield Golf Course

Deerfield Golf Course remains within the Parkway Belt. It is owned by the Province of Ontario and currently leased to a golf operator. It is not subject to any applications at this time.

Confidential discussions

Under the Municipal Act, municipal councils may go “in camera” or into “closed session” to discuss litigation or potential litigation, including matters before administrative tribunals such as the Ontario Municipal Board, as well as if the subject matter is advice that is subject to the solicitor-client privilege. This is to protect the best interests of the town. The details of what was discussed in camera or how an individual member of Council voted cannot be disclosed. The minutes for the meeting note that “Direction was provided to staff and legal counsel in closed session.”

Negotiation details

The actual settlement negotiations were conducted “without prejudice” which prevents the disclosure of information shared until and unless all relevant parties agree. These rules promote the open sharing of information and discussion of options among the parties. The town did inform Members of Council and the 51 participants to the process that further work and studies were underway, and that a potential outcome of this work would be to resolve outstanding issues. Final settlement documents are available on this website, and participants were given the opportunity to review the settlement, and provide their feedback to the Board.

Enns lands

In 2022, development applications were filed with the town with respect to a portion of the lands on the west side of Bronte Road which are often referred to as the “Enns lands” but referred to as the “Bronte Road West Lands” in the draft Official Plan amendment filed with the Ontario Municipal Board as part of the settlement. Applications for zoning by-law amendment and subdivision of the lands would be required prior to any development.

However, the Bronte Road West lands were included in Bronte Green’s application for Official Plan amendment. The Enns, as owners of most of the Bronte Road West Lands have been a party to the hearing before the Ontario Municipal Board seeking Official Plan designations that would permit the future development of their lands.

The settlement, if approved by the Board, would establish land use designations that would apply to the Bronte Road West Lands if the lands are removed from the Parkway Belt West Plan (PBWP) by the Province. An application to remove part of the Bronte Road West Lands from the PBWP was filed with the province in 2005 and has been on hold. The Official Plan amendment submitted to the Board would establish the boundaries of the Natural Heritage system on the Bronte Road West Lands based on scientific evidence, including 30 metre buffers from woodlands. The designations in the draft Official Plan amendment would allow for the future development of the balance of the lands with medium density along Bronte Road and low density at the rear of the property.

Contact

Paul Barrette, MCIP, RPP
Senior Planner, Planning Services
905-845-6601, ext. 3041
paul.barrette@oakville.ca